- Foundation: R.C.C. Foundation as per design of structural consults.
- Structure: R.C.C. Frame structure.
- Wall : Wall shall be constructed with bricks.
- Flooring: Vitrified Tiles Flooring.
- Balcony & Open Terrance Flooring: Floor Tiles.
- Water Flooring: All roots & toilets shall be treated with water proofing compound.
- External Wall Finish: All external walls shall be finished with putty wash and two coat of weather shield paint.
- Internal Wall Finish: All internal walls shall be finished with Plaster of Paris paint.
- Choukhats: Steel door frame/ wooden door frame Equivalent.
- Entrance Door: Entrance door shutter, water proof Flush door finish with natural polish and other side painted with two coats synthetic enamel of specified color over the coat of primer & putty.
- Other Door: 30mm thick ISI mark flush door shutter painted with synthetic enamel over a coat of primer & putty.
- Kitchen: Floor Tiles (Anti Skid) Working Platform- Granite/ Green tiles Sink- Stainless Steel.
- Bathroom: Flooring- Antiskid Tiles Wall Glazed Vitreous Sanitary Ware Fittings- Chromium plated of continental series of all fitting is standard quality with ISI mark of equivalent.
- Window: Aluminum window (Double Shutter) with clear glass.
- Corridor: Antiskid Tiles/ Ceramic/ Vitrified.
- Electrical: All Internal Wiring in Concealed Conduits with ISI Mark Copper cable All electrical Switcher and accessories of ISI mark Adequate lighting/ Socket. Outlet etc. provided in each room A.C. Point with 15 AMP Power Plug provided in Master Bed Room.
- T.V. Cable: One T.V point provided in Drawing Room.
- Lift: KONE/ OTIS/ JONSON elevator or equivalent in each Apartment Block.