Triveni|Flat In Ranchi |Builders In Jharkhand |Builders in Ranchi |Builders in Dhanbad

Triveni Sapphire
Triveni Sapphire is elegantly designed with appealing features conformity with vastu to settle in style situated in Arrah More, Shiv Talla, and Durgapur.The master plan is done by renowned SANJAY PAUL & ASSOCIATES
  • BANKS & ATM 5min.
  • REPUTED HOSPITALS 7min
  • REPUTED SCHOOLS 7min
  • N.S.H.M. COLLEGE 2 min
  • BUS STAND 4 min
  • CITY CENTRE 15 min
  • RAILWAY STATION 20 min
Specification
  • FOUNDATION: R.C.C. foundation as per design of structural consultants
  • STRUCTURE: R.C.C. Frame structural
  • FLOORING: Vitrified Tiles Flooring
  • INTERNAL WALL FINISH: All internal walls shall be finished with Plaster and Paris , paint
  • EXTERNAL WALL FINISH: All external walls shall be finished with putty wash and two coat of weather shield paint
  • DOORS: ISI mark flush door shutter painted with synthetic enamel over a coat of Primer & putty
  • KITCHEN: Floor Tiles (Anti Skid) Working Platform- Granite/ Green Slab, Dado- Premium Quality Painted 24” , high Glazed tiles Sink –Stainless Steel
  • BATHROOM: Flooring- Antiskid Tiles, Wall Glazed tiles up to 72” level
  • Sanitary- White Glazed Vitreous Sanitary Ware Fittings ISI mark or equivalent
  • WINDOW: Aluminium window (Double Shutter) with clear Glass
  • ELECTRIC: All Internal Wiring in concealed Conduits with ISI Mark Copper cable. All electric Switches and accessories of ISI mark Adequate lighting/ Socket, Outlet etc
  • LIFT: KONE/ OTIS/ JONSON elevator or equivalent in each Block.

FACILITIES
  • Car Parking 1,50,000.00/-
  • EXTRA CHARGES
  • Legal 6,000.00/-
  • Generator 25,000.00/-
  • Electric Connection 20,000.00/-
  • Cable Wiring 5,000.00/-
  • Intercom Set 5,000.00/-
  • Transformer 20,000.00/-
  • Fire System 15,000.00/-
  • TOTAL 1,01,000.00/-
Payment schedule
  • Initial Booking Amount 1,51,000.00/-
  • Upon Completion of Foundation( before casting of 1st slab) 20%
  • Upon casting of 1st Floor(before casting of 2nd slab) 15%
  • Upon casting of 2nd Floor(before casting of 3rd slab) 15%
  • Upon casting of 3rd Floor(before casting of 4th slab) 10%
  • Upon casting of 4th Floor(before casting of 5th slab) 10%
  • Upon casting of brick work(before completion of cement plaster) 10%
  • Upon completion of plaster work 10%
  • Before 15 days of the possession Balance Amount

Gallery