Triveni|Flat In Ranchi |Builders In Jharkhand |Builders in Ranchi |Builders in Dhanbad

Triveni Regent

Triveni Regent is especially designed to offer all the amenities for high class living. With morden facilities, the building has been exclusively designed keeping in mind the principles of Vastu Shastra situated at Near GIC Colony, Post - Nag Nagar, Dhaiya, Dhanbad, and Jharkhand.The master plan is done by renowned DESIGN CORNER.

  • RAILWAY STATION 4 KM
  • BUS STAND 1.5 KM
  • HOSPITAL
  • JALAN HOSPITAL 1.5 KM
  • CENTRAL HOSPITAL 2.5 KM
  • PMCH 3 KM
  • SCHOOL
  • DELHI PUBLIC SCHOOL 2 KM
  • DENOBILIE SCHOOL 1 KM
  • CARMELL SCHOOL .5 KM
  • DAV KOYLANAGAR 4 KM

Specification
  • Foundation: R.C.C. Foundation. Treated with Anti-termite Treatment.
  • Structure Sturcture: R.C.C. Frame structure.
  • Wall : Internal walls and ceiling shall have plaster and paris finish, and two coats of distemper paint.
  • Flooring: Vitrified Tiles 2’X2’ .
  • Windows: Two Track Aluminum sliding window with clear glass and grill.
  • Toilets: One toilet will be Indian type and another will be western type pan. Hot & cold water in both toilets. Anti skid tiles/ceramic tiles flooring and glazed tiles dado upto 6 feet height. White sanitary fitting.
  • Kitchen: Anti skid tiles / Ceramics tiles flooring and green marble cooking plateform with glazed tiles upto 2”6”. height and stainless steel sink in kitchen. One power point for grinder/mixer.
  • Door: CI sheet door frame flash door. Main door with polished teak ply on front side and rest all doors will be painted with two coats of synthetic enamel paint on a coat of primer.
  • Electricals: Copper wiring in PVC concealed conduit. Adequate lighting/sockets, outlet etc. provided in each rooms. Telephone, TV point in living area and one AC point in master Bedroom.
  • Elevator: High speed elevator JOHNSON or Equivalent.
Payment schedule
  • Initial Booking Amount 1,51,000/-
  • Upon Completion of Foundation( before casting of ground floor) 20%
  • Upon casting of ground floor(before casting of 1st slab) 10%
  • Upon casting of 1st Floor(before casting of 2nd slab) 10%
  • Upon casting of 2nd Floor(before casting of 3rd slab) 10%
  • Upon casting of 3rd Floor(before casting of 4th slab) 10%
  • Upon casting of 4th Floor(before casting of 5th slab) 10%
  • Upon casting of 5th Floor(before casting of 6th slab) 10%
  • Upon completion of brick work (before completion of cement plaster) 10%
  • Upon completion of plaster work 10%
  • Before 15 days of the possession Balance

Gallery