Triveni Hill

Triveni Hill is especially designed to offer all the amenities for high class living. With morden facilities, the building has been exclusively designed keeping in mind the principles of Vastu Shastra situated at,Vanasthali Colony to Seraidhela and Jharkhand.The master plan is done by renowned CREDEN CONSULTANCY.

  • RAILWAY STATION 5 KM
  • SCHOOL
  • DHANBAD PUBLIC SCHOOL 200 METRE
  • DELHI PUBLIC SCHOOL 3 KM
  • DAV KOYLANAGAR 2 KM
  • HOSPITAL
  • PMCH 2 KM
  • CENTRAL HOSPITAL 2.5 KM
Specification
  • Foundation: R.C.C. Foundation. Treated with Anti-termite Treatment.
  • Structure: R.C.C. Frame structure.
  • Wall : Internal walls and ceiling shall have plaster and paris finish. One coat cement primer over it & two coats of distemper paint.
  • Flooring: Vitrified Tiles 2’X2’ .
  • Windows: Two Track Aluminum sliding window with clear glass and grill.
  • Toilets: One toilet will be Indian type and another will be western type pan. Hot & cold water in both toilets. Anti skid ceramic tiles flooring and glazed tiles dado upto 6 feet height in each bathroom. White sanitary fitting.
  • Kitchen: Anti skid tiles / Ceramics tiles/ Ceramic tiles flooring and granite kitchen platform with glazed tiles upto 2ft. height and stainless steel sink in kitchen. One power point for grinder/mixer.
  • Door: ISI Mark flush doors and steel door frame main door with teak polished on one side and rest all doors will be painted with two coats of synthetic enamel paint on a coat of primer.
  • Electricals: Copper wiring in PVC concealed conduit. Adequate light, Fan & plug points on all rooms. Conceal Telephone, TV point in living area and one AC point in master Bedroom.
  • Elevator: High speed elevator.
Payment schedule
  • Initial Booking Amount 1,51,000/-
  • Upon Completion of Foundation 15%
  • Upon casting of 1st Floor(before casting of 2nd slab) 15%
  • Upon casting of 2nd Floor(before casting of 3rd slab) 15%
  • Upon casting of 3rd Floor(before casting of 4th slab) 15%
  • Upon casting of 4th Floor(before casting of 5th slab) 10%
  • Upon completion of brick work & plaster work(before completion of cement plaster) 10%
  • Upon completion of plaster work 10%
  • Before 30 days of the possession Balance